All types of heaters and thermostat
Pressure Compensation Device DA 084
High degree of protection
Easy to install
It has becomemore andmore important to provide a protected enclosure environment for valuable and crucial electrical and electronic components. In a tightly closed enclosure, pressure differentials can occur during extreme temperature variations, such as day/night operation. When this occurs, the risk of dust and humidity being absorbed into the control panel increases dramatically. The specially designed pressure compensation device DA 084 permits a controlled change in pressure. It can be installed easily in any enclosure. The pressure compensation device is suitable for the use in enclosures and switch cabinets in accordance with DIN EN 62208.
Technical Data
Mounting |
PG 29 thread with union nut |
Torque |
5Nm (max. 10Nm) |
Material |
plastic according to UL94 V-0, pebble grey |
Sealing |
sealing gasket NBR |
Air interface |
approx. 7cm² |
Dimensions |
Ø 65.5mm x 30.5mm |
Fitting position |
vertical* |
Operating/Storage temperature |
-45 to +70°C (-49 to +158°F) |
|
Protection type is restricted to IP54 if fitting position of DA 084 is not vertical.
InstallationMake cut-out Ø 37+1mm in enclosure wall and mount pressure compensation device with nut. Please make sure that the sealing gasket is put in place on the outer side panel of the enclosure. For optimal pressure compensation we recommend to use two devices on opposite sides towards the top of the enclosure. |
Art. No. |
Protection type |
1 packing unit |
Weight (approx.) |
08400.0-04 |
IP55 |
2 pieces |
62g (31g/pc.) |
|
PS:If you can't find the exact type of your product.Please don't rush to go away.Contact me and your questions will be replied ASAP.Thank you for your time.
Our Services
1. Prompt reply: Any inquiry or questions would be replied within 24 hours. |
2. Quality Product: Manufacture company, each of the products is tested and calibrated. |
3. Hospitality: Offer smiling service and your visiting is highly welcomed |
4. Fast delivery: delivery time is within 3-7 days usually, other occasion depends on the order qty. |
Trade Information
Trade Terms |
FOB ,CIF ,CFR,EXW,DDP |
Payment terms |
T/T,L/C,Western union,Paypal,Escrow,MoneyGram |
Payment conditions |
30% deposit in advance,70% balance before shipping. |
Delivery time |
3-7working days after deposit,2-4 working days for inventory |
Packing |
Neutral carton,Wooden case for large size |
Shipping |
By sea,by air and by express delivery |
Payment conditions |
30% deposit in advance,70% balance before shipping. |
Delivery time |
3-7working days after deposit,2-4 working days for inventory |
Packing |
Neutral carton,Wooden case for large size |
Shipping |
By sea,by air and by express delivery |
Company Profile